by Francesco | Aug 17, 2015 | Stages and Structures for public Events
Installation and maintenance of the internal surveillance system present on all cantilever...
by Francesco | Jul 2, 2015 | Coverings
System of provisional two-pitched roofs, application with aluminum beams and PVC cover sheets. The T74 Building roofs combined with the side shields on the scaffolding, are lightweight structures and suitable both for the protection of construction sites from...
by Francesco | Jul 21, 2014 | Industrial Sites
Perimeter work plans for systems insulation access and...
by Francesco | Jul 16, 2014 | Interior Design, Stages and Structures for public Events
Partitioning of all stands of the fair with new material and infrastructures service...